Custom Container Gyms
Own your own gym.
We design, build, and install premium container gyms, tailored to your needs. We'll collaborate with you to create the optimal training solution, whether it's for you, your clients, or your employees.
The deluxe build-out package
The Deluxe build-out package includes standard ISO shipping container doors, a steel roll-up door, painted interior and exterior, rubber flooring, and an industrial electrical set-up featuring a fan, shop lights, & exposed conduit.
The premier build-out package
The Premier build-out package includes a modern style single-entry outward swinging door, insulated and drywall finished interior walls & ceiling, painted interior and exterior, rubber flooring, and a modern finish electrical set-up featuring a mini split AC unit & flush mount lights.
The Group Training Gym build-out package
The Group Training Gym build-out package includes exterior-mounted training rigs offering multiple workout stations, and interior-mounted storage for additional gym equipment. It also includes a painted exterior and an industrial electrical setup with shop lights, exterior lights, and exposed conduit.
completed projects
Get a quote
Our build facility is out of Las Vegas, NV.
More information
Frequently Asked Questions
We custom fabricate One Trip, High Cube ISO shipping containers, which feature exterior dimensions of 8 ft wide, 9.5 ft high, and lengths of either 20 ft or 40 ft. Before any interior modifications, the internal dimensions typically measure around 7.6 ft wide and 8.6 ft high. 'One Trip' refers to these containers being the newest available in the United States—they are used for a single overseas cargo journey before being repurposed for other applications.
The entire build process usually takes about 16-20 weeks, encompassing the initial consultation and design phase, ordering, construction, and delivery. We strive to meet this 16-20 week timeline consistently. However, long lead times for materials and gym equipment or large multi-unit orders could extend this timeframe.
We follow a build-to-order approach, meaning the build process starts once an order is confirmed with an initial deposit. Our standard payment structure is 60% upfront, 30% during production, and the final 10% upon completion. The initial deposit is front-loaded to allow us to order materials and commence construction without delay. Subsequent payments are due later in the build process, after providing you with progress updates and photos. We’re flexible and can work with you to create a payment plan that suits your needs, and we're also happy to assist in exploring financing options.
The typical delivery and installation process involves loading the finished unit onto a hot shot trailer at our facility and transporting it to your specified address. Upon arrival, a crane will unload and position the unit. The placement area should be level and capable of supporting at least 7,500 lbs. A common, cost-effective foundation option is four leveled concrete footings under each corner of the unit, as only the corners make contact with the ground. We offer delivery services throughout the entire United States.